From July 14 to July 28, the short retaining wall at the hospital’s main entrance will be rebuilt. During this time, the road in front of the retaining wall will be closed to all vehicles and pedestrians, and everyone will be directed under the main entrance overhang. Traffic through the overhang will be one-way, entering from the east only and exiting to the west. See the map for clarification.